Positioning of transformers in a technical room
Our client posed the question if we were able to position transformers in a technical room. There were four of them and they were very heavy.
Our client posed the question if we were able to position transformers in a technical room. There were four of them and they were very heavy.
The department industrial science of the University of Leuven moved from Ostend to its new building in Bruges. Lifthing ensured the move of heavy machines
Can Lifthing internally move an injection moulding machine? Our client needed to move an extremely heavy Stork injection moulding machine internally on his site but
In Ertvelde, Lifthing successfully completed the mounting of a tank park. At the correct times and in cooperation with the client we took care of the
A Dutch company needed to replace its old bending bench, also known as a side bench, with a new one. Lifthing was asked to take
Tijdens de shut-down op een industriële site hebben we in een chemisch bedrijf een warmtewisselaar vervangen. Met behulp van een kraan, staartkraan en sleesysteem hebben
There was a hospital in Brussels that had planned to replace and MRI scanner. The weight of it was five tonnes and on top of that
Onze klant had een nieuwe spuitgietmachine gekocht. Hij vroeg ons te zorgen voor het lossen en plaatsen van een spuitgietmachine. Lifthing loste de machine op
How to go about placing and assembling an air group with a gantry? In this project it occurred in several stages. First, we brought up the
The faculty Toegepaste Ingenieurswetenschappen van de Universiteit Antwerpen (Applied Engineering Sciences of the Antwerp University) moved to its new location on Campus Groenenborger. Lifthing was
Lifthing NV
Zeilschipstraat 16
B-9000 Ghent
+32 9 394 44 48
info@lifthing.com
BTW BE 0630.796.443
Ghent (BE)
Antwerp (BE)
Lille (FR)
USA
+32 9 394 44 48
+32 3 331 30 53
+33 3 66 88 29 19
+1 646 661 3528