
Jacking and sledding of a transformer
In an environment of high voltage, it is not always possible to work with a telescopic crane in order to move a transformer. This was

In an environment of high voltage, it is not always possible to work with a telescopic crane in order to move a transformer. This was

In the nuclear facility of Doel we have exchanged the position of two transformers. Because we possess an Habil clearance we have permission to work in a

Lifthing took care of the loading of heavy machine parts unto a ship. At the request of the client we transported numerous heavy parts of machines

In the proton centre at the University Hospital in Leuven, we were engaged to install new, high-tech proton therapy devices. This installation included preparatory welding,

A new production line was installed in the production environment of a company in Ghent. Lifthing performed both the mechanical and electrical installation with the

In this project, we used our pick and carry crane to install heavyweight equipment in a limited space. This enabled us to position a motor

About 120 air handling units were installed and assembled in the new hospital in Roeselare. The various parts had to be brought in through openings
To provide the best experiences, we use technologies such as cookies to store and/or access information about your device. By agreeing to these technologies we can process data such as surfing behavior or unique IDs on this website. If you do not give consent or withdraw your consent, this may adversely affect certain functions and options.